# How do you check critical path analysis skills in Borama?

> Ask for the programme files, the logic links and the delay records behind any critical path claim on a Borama build, not the claim itself.

- By: Editorial Team, Somali Construction Review (https://somaliconstructionreview.com/about)
- Published: 18 September 2026
- Format: Practical guide (general practice)
- Publication: Somali Construction Review (https://somaliconstructionreview.com)
- Subject: Business and Costs
- Place: Borama, Somaliland
- Tags: borama, somaliland, project-management, site-execution, due-diligence
- Web version: https://somaliconstructionreview.com/blog/critical-path-analysis-competency-risks-borama

## Key points

- A critical path claim is only as good as the programme file, logic links and progress records behind it.
- Misidentified delay drivers send crews and money to the wrong activity while the real blocker keeps slipping.
- Ask for the baseline, the update history and a worked delay example before you award the work.

A client cannot verify critical path analysis competency in Borama from a bid document alone. The programme a bidder submits shows a sequence of bars; it does not show whether the logic behind them was tested. Ask for the baseline file, the update history and one worked delay example, then walk a recent site and compare what was planned against what happened.

## What does a critical path claim actually prove?

A bar chart proves someone can draw a sequence, not that the sequence is correct. The critical path is the chain of activities where any slip pushes the completion date. A competent planner shows that chain, the logic links that create it and the float on everything else. Ask for the native programme file, not a PDF image, so links and constraints can be opened. Ask which activities carry zero float and why. On a building job in Somaliland, the chain often runs through imported items, curing time or a specialist trade, so ask the planner to name the item that governs each milestone. If the answer is only a date, the claim is untested.

## How do misidentified delay drivers hurt a Borama build?

When the wrong activity is named as critical, crews, plant and cash go to the wrong place while the real blocker keeps slipping. A planner who marks blockwork as critical may miss a long lead on reinforcement, a late approval or a curing period that cannot be compressed. The site then absorbs the error as standing time: trades waiting, plant idle, supervision stretched. Diaspora clients feel this twice, through remittance timing and through return visits that arrive to no progress. The check is simple. Ask the planner to take one past delay, walk through the records that proved it, and show what the recovery action cost in time. A planner who cannot produce the records may be reading the programme rather than running it.

## How do you test the programme before you award?

Set a short test rather than a long interview. Give the bidder one scenario from your own project, such as a late delivery or a rain-affected week, and ask for a written update showing which activities moved, which gained float and what the new completion date is. Ask for the baseline, the last three monthly updates and a list of logic links with their constraints. Check that the same activity names appear across all files. Ask which programme software the planner uses and who else can open it. Confirm the contract language on programme submission and update frequency, because the schedule of records is usually set there, and ask the municipal engineer's office what programme records it expects on comparable works.

> **Tip:** Ask the bidder to open the programme file on their own laptop during the meeting and change one activity duration. Watch how the critical path moves. That single test shows whether they understand the logic or only the drawing.

## What to do next

Pick one recent building project in Borama and ask the planner for the baseline file, the latest update and one delay record. Compare the critical activities named in the bid with what actually happened on that job. If the file, the update and the record do not line up, treat the programme as a drawing, not a plan, and price the supervision you will need in its place.

## Questions

### What is the minimum programme evidence a bidder should provide in Borama?

A baseline file, the latest update and a worked example of one past delay with the records behind it. Ask to see the native file on screen, not a printed bar chart.

### Can a client check critical path claims without programme software?

Yes. Ask the planner to change one activity duration in front of you and explain how the completion date moves. The answer shows whether they read the logic or just the drawing.
