Who checks lifting plans in Hargeisa?
A lifting plan only works if the people named in it can run it. Ask for the plan, the roles and the proof for each before the load leaves the ground.
Every published article, newest first. Search by subject or place, or browse by topic.
2138 articlesshowing 1945 to 1968
Engineering and MethodsHargeisa
A lifting plan only works if the people named in it can run it. Ask for the plan, the roles and the proof for each before the load leaves the ground.
Engineering and MethodsBorama
Low lintel bids in Borama usually leave out propping, bearing and curing. Check the scope line by line before you compare prices.
Business and CostsBurao
Material receiving skills gaps in Burao let cement, rebar and aggregate pass on paperwork alone. Here is how to detect and close the gap.
People and SkillsHargeisa
Unassessed trainees and hired crews can both pass a CV check, so Hargeisa clients should test real skills on site before trusting the work.
Business and CostsBorama
Engineer availability gaps on Borama builds let nominal technical oversight hide missed inspections. Check attendance against signed inspection records.
Business and CostsBorama
Material waste rates in Borama rise when nobody counts material in against material fixed. Reconcile deliveries, stores and drawings.
Business and CostsBorama
Ask for the programme files, the logic links and the delay records behind any critical path claim on a Borama build, not the claim itself.
Business and CostsBerbera
A provisional sum is an allowance, not a price. Ask for the build-up, a named rate source and a recent site before you sign.
Engineering and MethodsGabiley
Check the upstand, the waterproofing turn-up and the flashing lap before roof sheets go on. Water entry at roof edges shows up later as ceiling stains.
Infrastructure and ServicesBurao
Culvert levels skills gaps in Burao let crews set inverts and outlet grades by eye, so stormwater ponds or scours instead of draining away.
Infrastructure and ServicesBerbera
Weak supervision lets insulation resistance, polarity and earth loop readings go unchecked in Berbera, so wiring faults stay hidden until energisation.
Infrastructure and ServicesBorama
Low plumbing ventilation bids in Borama can mean vent pipes, flashings or testing were left out. Check the scope before you compare prices.
Ground and FoundationsBerbera
Hardcore placed without supervision can leave an unstable floor base. Check layer thickness, compaction and testing before the slab goes down.
Engineering and MethodsGabiley
Skills gaps in hot weather concreting in Gabiley show up as plastic shrinkage cracking and weak surfaces. Supervisors can catch them before and during the pour.
Ground and FoundationsHargeisa
Attendance at a site level survey course in Hargeisa does not prove a worker can set a benchmark or read a level. Check the record, not the certificate.
Beam detailing gaps in Burao show up as congested reinforcement zones. Check bar schedules, cover and buildability before the pour, not after.
Engineering and MethodsBorama
Curing claims prove little. Ask for dated records, mix and pour logs, and a small test panel before you accept them.
Ground and FoundationsBorama
Weak supervision lets loose backfill pass as compacted. Check layer thickness, moisture and test records before the slab goes down.
Attendance at a rock excavation course proves nothing on its own. What matters is assessed, signed-off practical work on plant and rock in Burao.
Business and CostsGabiley
A provisional sum is an allowance, not a price. It can leave the labour skill the instructed work needs unpriced, so ask what the method and test will be.
Business and CostsBerbera
A low Berbera bid can assume an engineer who is not actually available. Test that assumption with documents and dates before you award.
Infrastructure and ServicesBurao
A missing or blocked vent lets sewer gas into a building in Burao. Check the vent work on site by pouring water and watching the trap.
Infrastructure and ServicesBerbera
Crossfall claims need proof. Ask for level records along each chainage and check whether water actually drains after rain in Berbera.
Engineering and MethodsBorama
Roof falls competency in Borama rests on written method and site evidence, not claims. Ask for the fall schedule, then check it on site.