In brief

  1. The African Development Bank's November 2025 appraisal puts Bosaso's installed generation at 24.18 MW and available capacity at about 14.59 MW.
  2. Of that installed figure, 23.18 MW is diesel and 1 MW is solar PV without battery storage, owned and operated by Puntland Electric Power Company.
  3. The document is a funder appraisal ahead of a planned board presentation on 5 December 2025, with implementation targets for 2026 to 2030, not completed works.
Contents
  1. What the source records
  2. What it means on site
  3. What the source does not establish
  4. What to do next

The African Development Bank published a project appraisal report in November 2025 for the Rehabilitation and Expansion of Bosaso Power Grid and Strengthening of Energy Sector Institutions, ahead of a board presentation planned for 5 December 2025. The report records the city's present generation as a nameplate figure and a much smaller available figure, and sets out distribution works intended for 2026 to 2030.

What the source records

The appraisal states that installed power generation capacity in Bosaso is 24.18 MW while available capacity is about 14.59 MW, made up of 23.18 MW of diesel and 1 MW of solar photovoltaic without battery storage. It attributes ownership and operation to Puntland Electric Power Company, whose generation accounts for about 75 percent of the total, with Tawfiq, Somtel and Al-Fardaws at about 25 percent. The same document records a 3.5 MW solar plant in the western part of the city as completed but not yet connected, expected on the network by the beginning of 2026, and a PEPCO 4.5 MW medium speed diesel plant under repair, expected in commercial operation by the end of 2025. See the African Development Bank.

What it means on site

Nameplate and available capacity are different numbers, and the gap is what sizes a genset, a changeover or a cold store. A client planning a workshop, a water pump or a hotel can ask the utility and the local electricians what firm capacity reaches the plot at peak hours, not what the plant can produce on paper. The report names voltage drop and transfer limits on isolated 11 kV and 15 kV networks at peak load, which points to voltage logging at the meter and a check on transformer rating before committing to motor loads. General practice is to confirm the supply capacity in writing from the utility before ordering equipment.

What the source does not establish

This is an appraisal, not a completion report. The distribution package, 3,000 smart or prepaid meters and 5,000 solar home systems, are design targets for 2026 to 2030. The plant under repair and the 3.5 MW solar connection are described as expectations, not confirmed operation. The document does not establish today's condition of the Bosaso network, current tariffs or current outage patterns, and the figures are as of November 2025. Nothing here assigns fault for the capacity gap.

What to do next

A builder or client needing a firm supply figure should write to Puntland Electric Power Company and ask, for the specific plot, the available capacity at peak hours, the transformer rating and the connection point.

Frequently asked questions

Why is Bosaso's available capacity lower than its installed capacity?

The African Development Bank's November 2025 appraisal gives the two figures, 24.18 MW installed and about 14.59 MW available, without stating a cause. Ask the utility why a given plant is derated.

Does the 3.5 MW Bosaso solar plant supply the grid now?

The appraisal records it as completed but not yet connected, with connection expected by the beginning of 2026. That is the source's as-of date, so confirm the present state with the utility.

Sources

  1. Bosaso power grid rehabilitation and expansion (ESPSEI)African Development Bank, November 2025, afdb.org. Funder appraisal report; project information sheet, paragraph 9 and paragraph 23.2.1.

Local reporting: this article is written for building work in Bosaso and Puntland. Ground conditions, prices and rules differ between places; confirm the details for your own site.