In brief

  1. A low roof sheet fixing price often means the bidder left out purlins, fasteners, laps or access, not that the work is cheaper.
  2. Ask for a written rate build-up per square metre and compare it line by line with the drawings and specification.
  3. Walk the roof after the first bay is fixed to check fastener spacing, lap direction and whether sheets sit flat on the purlins.
Contents
  1. What does a low roof sheet fixing bid leave out?
  2. How does underbidding show up in the finished roof?
  3. How do you check the bid and the work in Borama?
  4. What to do next

A roof sheet fixing bid in Borama can look cheap because the bidder left work out, not because the work costs less. Underbidding on roof sheet fixing in Borama shows up as missing purlin runs, uncounted fasteners, short lap allowances, no access plan and no rate for cutting sheets around vents or parapets. The price is real; the scope behind it is not.

What does a low roof sheet fixing bid leave out?

A low bid usually leaves out the items that are awkward to count. Purlins and their fixing to the trusses are the first omission. A taker-off who measures only sheet area and not the number and length of purlin runs will miss steel, bolts and labour. Fasteners are next: screws, washers and their spacing along every sheet and every lap. Laps and end laps consume sheet length, so a bid priced on flat area without lap allowance will run short when sheets are cut. Access is the third item. Getting sheets onto a roof and working safely at the eaves needs ladders, scaffolding or a working platform, and that time is rarely priced in a cheap bid. Cutting and flashing around vents, chimneys and parapets add more. Ask the bidder for a written rate build-up per square metre listing sheets, purlins, fasteners, laps, access and cutting. Compare that list against the drawings and the specification clause by clause.

How does underbidding show up in the finished roof?

The shortcut appears as loose roof coverings. A crew that priced too few fasteners fixes sheets at wider spacing than the specification calls for, or uses shorter screws that do not grip the purlin. A crew that priced no access works from the eaves and leaves sheets misaligned, so laps open. A crew that priced no cutting forces sheets around obstructions and leaves gaps that wind and rain find. Wind-driven rain can lift poorly fixed sheets at the eaves and work them loose at the ridge, so confirm the local exposure with the project engineer and against the design data before fixing. Once sheets are down and sealed, the defect is hard to see from the ground. The general practice is to fix fasteners at the spacing named in the project specification, at every purlin crossing and along every lap, and to confirm that spacing with the engineer before work starts. This article cannot state a local fixing rule; the specification governs.

How do you check the bid and the work in Borama?

Check the bid before award. Ask each bidder for a rate build-up per square metre and a schedule of sheets, purlins, fasteners and flashings. Ask where the sheets and fasteners will come from and how they will be delivered to the site. For local matters, ask the municipal engineer's office what it requires for roof work on a building of this type, and what inspection it expects before sheets are covered. Then check the work in stages. Before sheets go down, walk the purlin grid with a tape and check spacing against the drawings. After the first bay is fixed, check fastener spacing, lap direction and whether each sheet sits flat on its purlins with no rock. Count the fasteners used in that bay and compare with the rate build-up. Keep the first bay open until the engineer has seen it.

What to do next

Before you award the roof package in Borama, send every bidder the same written request: a rate build-up per square metre covering sheets, purlins, fasteners, laps, access and cutting, plus the sheet and fastener source. Compare the returns on a single sheet of paper. Award only when the build-up matches the drawings and the specification, and hold the first fixed bay for inspection.

Frequently asked questions

Should I reject the lowest roof sheet fixing bid in Borama?

Not automatically. Ask for the rate build-up first. If the build-up lists sheets, purlins, fasteners, laps, access and cutting and matches the drawings, the price can stand. If items are missing, ask for a revised price that includes them before you compare.

What is the first sign on site that a roof was underbid?

Loose sheets. Check fastener spacing along each purlin and each lap against the specification. If the crew is using fewer fasteners than the specification names, or the screws do not grip, stop and ask the engineer to inspect before more sheets go down.

Local reporting: this article is written for building work in Borama and Somaliland. Ground conditions, prices and rules differ between places; confirm the details for your own site.