In brief

  1. One supervisor covering several active sites cannot give each pour, fix and inspection the attention the drawings assume.
  2. Ask how many active sites the named supervisor covers and how often he expects to attend, then put that answer in the contract.
  3. Signing without inspecting leaves records that look complete, so test the paperwork against the work on the ground.
Contents
  1. What does an overcommitted supervisor miss?
  2. How do missed inspections hide in the records?
  3. How do you check workload before signing?
  4. What to do next

A workload assessment in Borama asks one plain question before work starts: how many active sites does the named supervisor cover, and how often can he actually stand on this one? Supervision fails quietly here. The same engineer or clerk of works who signs for one pour in Borama may be signing for three sites across the district, and the second and third visits get shorter each week.

What does an overcommitted supervisor miss?

He misses the checks that depend on being present at the right hour. Reinforcement cover before a slab pour, the first batch of concrete, the setting out before blockwork starts: these happen once, and a supervisor who arrives two days later sees only the finished surface. An overcommitted project team runs the same risk across a whole programme. When one person holds five sites, he plans his week around signatures rather than around the pour schedule, and the pour goes ahead without him because the gang is paid to work, not to wait. Ask the named supervisor how many active sites he covers and which days he expects to attend Borama. If the answer is vague, the schedule in the contract is the problem, not the man.

How do missed inspections hide in the records?

They hide because the record and the work are made at different times. A request for inspection form gets signed a day later, sometimes at an office, and the file looks complete. Walk a recent site and compare dates: the pour date on the delivery docket against the inspection date in the register. The gaps show up as a cluster, three or four activities signed on one afternoon. That pattern means the supervisor reviewed paperwork, not work. Ask the municipal engineer's office whether it holds records or approval files for similar plots, and ask for the inspection register for the current job before the next stage starts. Check test records too: concrete cube results, compaction results, and who witnessed the sampling.

How do you check workload before signing?

Make the supervision commitment part of the contract, not a verbal promise. Ask for the supervisor's name, his other active projects, and the number of visits per week written into the document. General practice is that critical stages such as setting out, reinforcement before a pour, and the first concrete batch need attendance at the time of the work, so confirm the stage list against the project specification or the engineer. Agree a simple attendance log the supervisor signs on site, with time in and time out. Then check what the contract allows if the named person changes: some contracts require written approval for a substitution, others do not. Read that clause before signing.

What to do next

Before the next stage starts, send the contractor a written request naming the supervisor, his other active sites, and the visits per week you expect. Ask for the response in writing and attach it to the contract file. If the answer does not match the programme, ask the engineer to review the supervision arrangement before work continues.

Frequently asked questions

Can one supervisor cover two sites in Borama?

Possibly, if the stages do not clash and travel between them is realistic. Ask for a weekly schedule showing which days he attends each site, and check it against the pour and inspection dates in the programme.

What records prove a supervisor attended?

A dated attendance log with arrival and departure times, signed on site, plus inspection requests dated the same day as the work. Compare those dates against delivery dockets and test records.

Local reporting: this article is written for building work in Borama and Somaliland. Ground conditions, prices and rules differ between places; confirm the details for your own site.