Borama water supply project
A water supply project in Borama, inaugurated by Somaliland's president, the Somaliland Development Fund reported in September 2025: more production, new household connections, storage tanks, renewable energy and an online management platform. At the inauguration the president announced a 27 percent cut in water tariffs from December 2025. Quantities were not given.
- Completed, as of 17 September 2025
- Sourced, not yet verified
The project in brief
- Place
- Borama, Somaliland
- Type
- Water supply
- Status
- Completed, as of 17 September 2025: Borama water project inaugurated: more production, new connections, tanks and solar
- Value
- Not published
- Start
- Not published
- Expected completion
- Not published
- Completed
- inaugurated, reported 17 September 2025
- Progress
- Not published
- Last checked
- 21 September 2026
Organisations named
- Implementing agency: Somaliland Development Fund, reported the inauguration in its own press release.
What the sources report
- 17 September 2025
Borama water project inaugurated: more production, new connections, tanks and solar
The Somaliland Development Fund reported the president inaugurating the Borama Water Supply Project, which introduces expanded water production, new household connections, storage tanks, renewable energy integration and an online water management platform.
- 17 September 2025
Borama water tariff cut 27 percent from December 2025
At the inauguration the president announced a 27 percent reduction in Borama water tariffs following a tariff study, from 15,000 to 11,000 Somaliland shillings per cubic metre from December 2025.
Related coverage
Sources and their limits
- Somaliland Development Fund: Borama water project inaugurated
Implementer press release, 17 September 2025. Checked 21 September 2026.
What it does not establish: Funder release; components listed without quantities; the tariff cut is a presidential announcement effective December 2025.
How this record was put together
Two facts from one press release.