Western Bosaso 3.5 MW solar plant
A 3.5 MW solar PV plant in western Bosaso that the African Development Bank's appraisal of November 2025 describes as completed but not yet connected to the network, with connection expected by the beginning of 2026.
- Completed
- Sourced, not yet verified
The project in brief
- Place
- Bosaso, Puntland
- Type
- Power and energy
- Status
- Completed: Bosaso's 3.5 MW solar plant built but unconnected, with connection expected in early 2026
- Value
- Not published
- Start
- Not published
- Expected completion
- Not published
- Completed
- Not published
- Progress
- Not published
- Last checked
- 21 September 2026
Organisations named
No source names a contractor, consultant, funder or other organisation on this project.
What the sources report
- November 2025
Bosaso's 3.5 MW solar plant built but unconnected, with connection expected in early 2026
The AfDB appraisal report states that a 3.5 MW solar PV plant in western Bosaso is completed but not yet connected to the network, with connection expected by the beginning of 2026.
Related coverage
Sources and their limits
- African Development Bank: Bosaso power grid rehabilitation and expansion (ESPSEI)
Funder appraisal report, November 2025. Checked 21 September 2026.
What it does not establish: Appraisal ahead of a board presentation planned for 5 December 2025; quantities are design targets for 2026-2030, not works done.
How this record was put together
One fact from the Bosaso grid appraisal, recorded apart from the grid project because it is a separate plant.