Projects · Road · Hargeisa

Hargeisa roads and Bundaweyn bridge

A road and bridge project in Hargeisa announced by Somalia's federal Ministry of Public Works in August 2026. The minister said the first phase covers 23 km of roads starting in Hargeisa and the Bundaweyn, or Big Bridge, at about USD 20 million, within a wider plan of about 45 km of paved roads; Kaab TV reported that the design and feasibility phase began with an initial USD 20 million. The project sits in the World Bank-supported NAGAAD programme, implemented with UNOPS. No construction contract, contractor or dates were published.

  • Planned, as of 8 August 2026
  • Sourced, not yet verified

The project in brief

Place
Hargeisa, Somaliland
Type
Road
Status
Planned, as of 8 August 2026: Hargeisa: a 45 km road plan opens with a USD 20 million design phase
Value
USD 20 million, first phase, as reported
Start
Not published
Expected completion
Not published
Completed
Not published
Progress
Not published
Last checked
21 September 2026

Organisations named

  • Owner: Federal Government of Somalia, began the design and feasibility phase, as Kaab TV reported. Source: Kaab TV (PLAN-015)
  • Funder: World Bank, supports the NAGAAD programme. Source: Kaab TV (PLAN-017)
  • Implementing agency: UNOPS, the NAGAAD programme is implemented with UNOPS. Source: Kaab TV (PLAN-017)

What the sources report

  1. 8 August 2026

    Hargeisa: a 45 km road plan opens with a USD 20 million design phase

    Kaab TV reported that the Federal Government began the design and feasibility phase for a road and bridge project in Hargeisa with an initial USD 20 million, within a wider plan of about 45 km of paved roads.

    Kaab TV, attributed reporting of a ministerial statement. Source · Our report

  2. 8 August 2026

    First phase: 23 km of Hargeisa roads and the Bundaweyn bridge

    Minister Ayuub Ismail Yusuf said the first phase involves 23 kilometres starting in Hargeisa and construction of the Bundaweyn, or Big Bridge, at an estimated cost of about USD 20 million.

    Hiiraan Online, attributed reporting of a ministerial statement. Source · Our report

  3. 8 August 2026

    Under NAGAAD: a USD 245 million programme delivered with UNOPS

    The Hargeisa project is part of the NAGAAD Programme, described as a USD 245 million urban resilience initiative supported by the World Bank and implemented with UNOPS.

    Kaab TV, attributed reporting of a ministerial statement. Source · Our report

  4. 8 August 2026

    89 km of roads under federal oversight across six states, Somaliland and Puntland included

    The minister said the federal government is overseeing projects involving about 89 kilometres of roads in Jubaland, South West, Galmudug, Hirshabelle, Puntland and Somaliland.

    Hiiraan Online, attributed reporting of a ministerial statement. Source · Our report

Related coverage

Sources and their limits

How this record was put together

Two sources report one ministerial statement of 8 August 2026. PLAN-018 is the minister's wider figure of about 89 km of roads under federal oversight, kept here as context. The sources note the political dispute between Mogadishu and Hargeisa over the project.

Figures are as the sources state them, with the dates they give. A correction or a newer source: tell the desk.