Engineering and MethodsHargeisa
How do rebar bending training gaps affect Hargeisa builds?
A bending certificate records attendance, not skill. Compare each bar against the bar schedule at the bench, before concrete goes in.
491 articles on building quality in Somaliland and Puntland, newest first, from Somali Construction Review.
Engineering and MethodsHargeisa
A bending certificate records attendance, not skill. Compare each bar against the bar schedule at the bench, before concrete goes in.
Missing or wrongly placed movement joints let tiled floors crack in Burao. Check joint layout, widths and records before fixing starts.
MaterialsBorama
Check batching before the pour: ask for the mix design, watch how sand, aggregate and water are measured, and test one batch before trusting the rest.
MaterialsBerbera
Cover holds up only if spacers, tying and pouring are checked. Weak cover skills let steel sit too close to the surface.
Ground and FoundationsHargeisa
Attendance records show a course happened, not that a fixer can place foundation rebar. Ask for a supervised bench test and dated cover records.
Engineering and MethodsBorama
A low cantilever bid often omits propping, formwork stiffness or the deflection check. Here is how to find the gap before you award.
Infrastructure and ServicesBorama
A low board price usually means omitted checks and parts. Ask for device schedules, feeder tests and circuit charts before you compare bids.
Infrastructure and ServicesGabiley
Set the tank so the cover stays reachable and the base is level. Check the layout, the base and the access before the slab goes on.
Engineering and MethodsBorama
Claimed render experience is not evidence. Check mix records, curing practice and a recent building before you award render work in Borama.
Engineering and MethodsBerbera
Ask for coverage and compaction evidence before tiling starts in Berbera, because a hollow tile usually means voids under the bed.
Attendance certificates do not prove a crew can place and compact foundation concrete. Here is how the gap shows up and how to close it.
Weak cantilever construction skills in Burao show up as excessive deflection, cracking and ponding. Check formwork, props, lap lengths and curing records.
Infrastructure and ServicesBorama
Claims about tank waterproofing competency in Borama prove nothing on their own. Ask for test records and see the work before you pay.
Engineering and MethodsGabiley
Hollow floor tiles come from bedding that never made full contact. Check coverage, back-buttering and the bedding mix before tiles are laid.
Engineering and MethodsBerbera
External render failures in Berbera often trace back to missed checks. Here is how supervision gaps arise and how to catch them before handover.
Ground and FoundationsHargeisa
Foundation concrete experience gaps in Hargeisa show up as weak footing sections, poor cover and no test records. Here is how to spot and close them.
MaterialsHargeisa
Stop cement going hard by fixing the store, not the bag. Raise bags, rotate stock, check each delivery date and reject lumps.
Ground and FoundationsGabiley
Attendance records do not prove founding depth competence. Check the dig, the test record and who signs off before concrete goes in.
Engineering and MethodsBerbera
Claims alone do not prove stair reinforcement competency in Berbera. Check bar schedules, anchorage details and test records before work starts.
Engineering and MethodsBorama
Ask for mixing records and a trial panel in Borama. Unverified plaster preparation claims can lead to loss of adhesion and hollow, drummy coats.
Engineering and MethodsGabiley
Stair reinforcement faults show up as wrong anchorage at laps and landings. Check the steel against the drawing before every pour in Gabiley.
Engineering and MethodsBorama
A lab name on a bid is not proof the cube testing was done right. Ask for the sampling record, the cube identity and the tested strengths in writing.
Engineering and MethodsBerbera
Plaster preparation supervision gaps in Berbera can cause loss of adhesion. Learn how to detect missed inspections and close the gap before coating.
Engineering and MethodsBorama
Supervision gaps in window sealing in Borama let rainwater penetrate through unsealed joints that nobody checked. Here is how to find and close them.