Ground and FoundationsQardho
How do you check footing setting out in Qardho?
Footing setting out depends on who checks the lines before the pour. Here is how supervision gaps shift load paths and how to catch them in Qardho.
62 articles on foundations in Somaliland and Puntland, newest first, from Somali Construction Review.
Ground and FoundationsQardho
Footing setting out depends on who checks the lines before the pour. Here is how supervision gaps shift load paths and how to catch them in Qardho.
Ground and FoundationsGarowe
Excavation support fails when nobody signs off the trench before workers enter. Here is how the gap opens and how to close it.
Ground and FoundationsGarowe
Low footing setting out bids in Garowe usually omit survey, compaction and cover items. Check the bid against the drawing and the engineer's specification.
Hardcore placement training gaps in Burao show up as rutted, pumping floor bases. Check assessment records and walk the compacted layer before screed.
Ground and FoundationsHargeisa
Hardcore placement experience gaps in Hargeisa show up as rutting, perched water and a floor slab poured on a soft base. Check the base before you pour.
Ground and FoundationsGabiley
Attendance records do not prove a crew can compact backfill in Gabiley. Ask for layer records, plate test results and a supervised trial area.
Weak backfill compaction experience in Burao shows up as soft spots and settlement under floors. Ask for test records and watch the water and layer thickness.
Ground and FoundationsGabiley
A ground beam joint works only if the steel anchorage, laps and cover are right before the pour. Ask for built examples and check the drawings.
Ground and FoundationsHargeisa
Attendance records show a course happened, not that a fixer can place foundation rebar. Ask for a supervised bench test and dated cover records.
Attendance certificates do not prove a crew can place and compact foundation concrete. Here is how the gap shows up and how to close it.
Ground and FoundationsHargeisa
Foundation concrete experience gaps in Hargeisa show up as weak footing sections, poor cover and no test records. Here is how to spot and close them.
Ground and FoundationsGabiley
Attendance records do not prove founding depth competence. Check the dig, the test record and who signs off before concrete goes in.
Weak founding depth experience in Burao can leave footing levels and bearing checks to guesswork. Here is how to detect and close the gap.
Ground and FoundationsGabiley
Limited excavation support experience in Gabiley can leave trench sides unsupported and the work unplanned. Check the crew's past sites and method statement.
Ground and FoundationsHargeisa
Attendance at footing setting out training in Hargeisa proves nothing on its own. Check the transfer of the grid to the ground and the records behind it.
Ground and FoundationsBorama
Low foundation waterproofing bids in Borama can leave out prep, laps and protection, so water reaches the concrete later.
Check the crew's detailing of laps, corners and pipe penetrations before backfill, because that is where below ground leakage starts.
Ground and FoundationsBerbera
Ask for membrane installation records, not claims. Unverified damp proof membrane competency in Berbera lets ground moisture reach the slab.
Ground and FoundationsGabiley
And how to catch them before concrete covers the sheet. Ask for dated photographs, lap details and an inspection hold point.
Ground and FoundationsBorama
Ask for layer records, level readings and compaction evidence before you accept hardcore placement claims on a Borama build.
Ground and FoundationsBerbera
Hardcore placed without supervision can leave an unstable floor base. Check layer thickness, compaction and testing before the slab goes down.
Ground and FoundationsBorama
Weak supervision lets loose backfill pass as compacted. Check layer thickness, moisture and test records before the slab goes down.
Ground and FoundationsBerbera
Low backfill compaction bids in Berbera usually omit water, testing and layer control, so floors settle later. Here is how to check and close the gap.
Ground and FoundationsHargeisa
Thin supervision and untested backfill let floors settle. Check layer thickness, moisture and compaction records before you pour.