Who Sets Out Building Boundaries Correctly in Burao?
Errors in boundary setting out in Burao trace to a skills gap, not bad intent. Check records and re-measure before walls and columns rise.
128 articles on skills gaps in Somaliland and Puntland, newest first, from Somali Construction Review.
Errors in boundary setting out in Burao trace to a skills gap, not bad intent. Check records and re-measure before walls and columns rise.
Ground and FoundationsGabiley
Level survey errors in Gabiley show up as finished floors that sit below the street or the drain. How the error happens, how to check a survey, and how to catch it before concrete.
Ground and FoundationsBosaso
Plant costs on Bosaso rock excavation spiral when crews misread the rock, break hammers and hire equipment by the day. How to check a crew and close the gap.
Ground and FoundationsGabiley
Foundations in Gabiley get undersized when the soil strength is assumed rather than measured. How the gap starts, what it costs, and how to verify a bearing capacity claim.
Ground and FoundationsBosaso
Trial pits skills gaps in Bosaso can bury weak layers under confident logs. Here is how the gap forms, how to catch it and how to close it.
Ground and FoundationsHargeisa
When nobody on a Hargeisa site can tell fill from natural ground, soft or organic material stays under the foundation and the building settles unevenly. How to spot and close the gap.
Flooded excavations in Burao usually trace back to a groundwater reading nobody took. How the skills gap forms, how to spot it and how to close it.
Ground and FoundationsHargeisa
Weak borehole logs reach the drawing board in Hargeisa when the sampler cannot record what matters. How the gap forms, what it costs, and how to catch it.