Engineering and MethodsProjectGarowe
Gambol bridge design: five spans, a 45 m centre span
NAGAAD's May 2022 ESMP describes the proposed Gambol Road bridge in Garowe as a five-span deck with a 45 m central span, 12.9 m wide.
75 articles on structural engineering in Somaliland and Puntland, newest first, from Somali Construction Review.
Engineering and MethodsProjectGarowe
NAGAAD's May 2022 ESMP describes the proposed Gambol Road bridge in Garowe as a five-span deck with a 45 m central span, 12.9 m wide.
Engineering and MethodsBosaso
A crew can set a column off grid or out of plumb, sending the load off centre. Check setting out, formwork and plumb before the pour.
Certificate attendance does not prove a crew can cut, trim and edge a slab opening, so interrupted load paths get built and covered.
Engineering and MethodsHargeisa
Slab openings experience gaps in Hargeisa show up as interrupted load paths, cut rebar and late changes. Here is how to detect and close them.
Engineering and MethodsBosaso
A certificate proves attendance, not competence. Check rebar laps in Bosaso by testing the steel fixers on the bar, not on paper.
Engineering and MethodsBosaso
Rebar bending experience gaps in Bosaso show up as wrong bar geometry. Check a sample of cut and bent bars against the bar bending schedule first.
Engineering and MethodsGarowe
Supervision gaps in cantilever construction let deflection and cracking start at the support, so check hold points, records and early warning signs.
Engineering and MethodsQardho
Cantilever competency in Qardho is proven by records and a sample pour, not by claims. Ask for deflection readings, mix records and steel fixing evidence.
Engineering and MethodsQardho
Supervision gaps in stair reinforcement show up as short anchorage at landings and walls. Check laps, cover and the steel before the pour goes in.
Engineering and MethodsGarowe
A low stair reinforcement bid in Garowe often leaves out bars, laps or anchorage. Check the priced list against the bar schedule before you award.
Engineering and MethodsQardho
A low prop removal bid in Qardho can mean the tender left out propping, monitoring or the wait for concrete to gain strength. Check the scope.
Engineering and MethodsBosaso
Prop removal skills gaps in Bosaso show up as props struck too early. Check the pour date, cube results and signed striking record first.
Engineering and MethodsGarowe
Check bracing competency by walking a recent pour, reading the design, and testing the crew on site, not by accepting claims.
Engineering and MethodsQardho
Ask for a bar bending schedule, a sample beam drawing and one built beam, then have the drawing checked before concrete goes in.
Engineering and MethodsGarowe
Beam detailing supervision gaps in Garowe let bar spacing, cover and lap errors get cast in. Check the drawings, the steel before the pour and the records.
Engineering and MethodsQardho
Supervision gaps in Qardho can let column alignment drift, and offset columns load the frame unevenly. Check plumb early and often.
Engineering and MethodsGarowe
Low column alignment bids in Garowe can hide omitted survey, setting-out and hold-down time. Check the method, not the price.
Engineering and MethodsQardho
Slab openings get underbid in Qardho when trimmer bars, edge forms and load path checks are left out of the tender. Here is how to catch it.
Engineering and MethodsBosaso
Slab openings in Bosaso fail when nobody checks the trimming steel, the setting out or the pour. Ask for the bar schedule, the engineer and records.
Engineering and MethodsGarowe
Concrete cover claims in Garowe are easy to make and hard to see. Ask for cover meter records and put the checks in the contract.
Engineering and MethodsQardho
A claim about rebar laps proves nothing until you check bar details, splice lengths and inspection records against the drawings. Ask for evidence.
Engineering and MethodsQardho
Weak supervision lets wrong bar geometry pass on Qardho sites. Check bar schedules, bending records and cover before the pour.
Engineering and MethodsGarowe
Weak supervision lets rebar laps go short, dry and unchecked in Garowe, so the joint between bars carries less load than the drawing expects.
Engineering and MethodsGarowe
Low rebar bending bids in Garowe often leave out work, assume the wrong bar geometry or miss costs. Here is how to check a bid before you award it.