JobDesign and supervisionMogadishu

Invitation to Bid for the Construction of the Central Bank of Somalia’s Alternative Business Continuity Site in Mogadishu

Central Bank of Somalia

Issued by
Central Bank of Somalia
Applications close
Status
Open
Duty station
Mogadishu
Work arrangement
Not specified
Employment type
CONTRACT
Trade
Design and supervision
Who may apply
Not specified
Posted
Apply
https://www.centralbank.gov.so
Last checked

About the role

The Central Bank of Somalia is inviting qualified contractors to bid for the construction of its Alternative Business Continuity Site in Mogadishu. The tender is issued under reference CBS/ITB/009/2026 and sets out conditions of tendering and terms and conditions of purchase that the winning bidder will sign. The notice was issued on 25/11/2026 and closes on 15 December 2026.

What you will do

  • Carry out the construction of the Alternative Business Continuity Site in Mogadishu in line with the tender documents.
  • Work to the Bill of Quantities, Terms of Reference, and designs and drawings supplied with the invitation.
  • Submit a bid that meets the conditions of tendering set out in the invitation.
  • Sign the terms and conditions of purchase if selected as the successful bidder.

What you need

  • Must be a qualified contractor eligible to take part in the tender.
  • Must be able to work to the Bill of Quantities, Terms of Reference and designs and drawings provided.
  • Must submit a return tender that is received by the closing date.
  • Must keep the returned bid open for consideration for at least 90 days from the closing date.

How to apply

Interested eligible and qualified contractors should send their return tender so that it is received no later than 15 December 2026 at 5:00pm East African Time. Requests for further information or clarification on the tender requirements should be made in writing to the Procurement Division. Contact details are shown separately with this listing.

Open the original advert

Seen at ShaqoHel. Found on a listings board; the notice was read and its link checked before it was listed.

If something here is wrong

The notice governs, not this page. Where the two disagree, the notice is right, and the desk wants to know: tell the desk and the entry is corrected or taken down the same day. An entry is also taken down at the request of the body that issued it.