People and SkillsGarowe
What does language in training supervision gaps mean in Garowe?
Supervisors lose time when crew instructions are not understood. Check comprehension with a task briefing and a signed hold point.
Analysis, method and practical guidance for building across Somaliland and Puntland: what the evidence supports, what it costs on site, and what to do differently tomorrow.
1144 articlesshowing 217 to 240
People and SkillsGarowe
Supervisors lose time when crew instructions are not understood. Check comprehension with a task briefing and a signed hold point.
Business and CostsBorama
Ask for dated coordination records, not CVs. Coordination gaps appear where trade packages meet and nobody owns the joint.
Infrastructure and ServicesGabiley
A certificate records attendance, not skill. Test whether a fitter can set out a rail, level it and torque a bolt before the crew starts.
Infrastructure and ServicesGabiley
Attendance at a rainwater pipe sizing course does not prove a plumber can size a downpipe. Ask for the calculation, the test and the record.
Business and CostsHargeisa
Attendance at a provisional sums course in Hargeisa does not show who can adjust the tender total correctly. Test the adjustment, not the certificate.
Business and CostsHargeisa
Plant utilization experience gaps in Hargeisa show up as idle equipment and unrecovered ownership costs. Learn how to detect and price the risk.
Infrastructure and ServicesBurao
Drain lining experience gaps in Burao show up as erosion at weak sections and untested claims. Check records, not references.
Engineering and MethodsGabiley
Ask who actually installed the last roof, then check their laps, fixings and substrate records before you sign in Gabiley.
People and SkillsGabiley
A certificate does not prove a crew can read the method statement used on site. Here is how the gap shows up on a Gabiley job and how to close it.
Business and CostsBerbera
Interface coordination gaps in Berbera appear at trade boundaries: blockouts, sleeves and holds signed off by different crews with no shared check.
Business and CostsGabiley
Portfolio attribution gaps let a contractor claim credit for work they did not run. In Gabiley, check each reference role in writing before you sign.
Business and CostsBosaso
A bid can look complete while key work sits in a provisional sum, so Bosaso clients should test the bidder's record on that work before award.
Business and CostsBorama
Snagging inspections get missed in Borama when nobody with authority walks the finished work, so defects pass into handover unrecorded.
Business and CostsQardho
Delay records in Qardho prove nothing on their own. Check dates, causes and signatures against site evidence before you credit them.
Infrastructure and ServicesBosaso
A culvert training certificate records attendance, not a checked invert. Ask for the survey booking and re-measure levels before backfill.
Infrastructure and ServicesBosaso
Attendance at a distribution board course in Bosaso does not confirm an electrician can identify circuits safely. Ask for test records and observed work.
Business and CostsGabiley
Attendance at a waste-rates course does not show a Gabiley estimator can set a wastage allowance, so test the numbers against site records.
Engineering and MethodsHargeisa
A certificate records attendance, not skill. Balcony drainage training gaps show up as ponding and water backing into rooms below on Hargeisa sites.
Infrastructure and ServicesBosaso
Attendance records do not prove a soakaway designer can read trial pit data. Ask for test records and a signed sizing calculation.
Infrastructure and ServicesBurao
Solar mounting experience gaps in Burao show up as insecure panel supports. Check anchors, pull tests and wind calculations before work starts.
Engineering and MethodsBosaso
Shared balcony drainage experience in Bosaso is hard to prove, so falls, outlets and door thresholds get settled on site after the slab is cast.
Infrastructure and ServicesBurao
Rainwater pipe sizing experience gaps in Burao show up as undersized pipes and overflow during rainfall. Check capacity numbers before you build.
Business and CostsBurao
Skills gaps in Burao school building works usually show up in the sequence of trades, not in a school-leaving exam.
Business and CostsBorama
Low bids in Borama can hide work instructions that were never understood. Check the bid against a written method, not the price alone.