Construction projects
Roads, ports, power, water and public buildings in Somaliland, Puntland and across Somalia, each built from named public sources: what is planned, out to tender, under way or finished, who is named on it, and what the sources leave out.
7 projectsShow all
- Planned, as of 26 May 2026
- Power and energy
- Under review
Berbera 12 MWp solar and 70 MWh storage expansion
A USD 24 million energy project launched in Berbera by Somaliland's energy minister, Somaliland Standard reported in May 2026: 12 MWp of solar generation and a 70 MWh battery storage facility…
- Completed, as of 19 February 2026
- Power and energy
Berbera 5 MWp solar plant (Global South Utilities)
A 5 MWp grid-connected solar plant in Berbera, inaugurated by Global South Utilities on 17 February 2026 as part of its Green Berbera Vision programme, Ecofin Agency reported.
- Launched, as of 24 March 2025
- Water supply
Berbera City Water Expansion Project
A water expansion project for Berbera whose foundation stone Somaliland's president laid on 23 March 2025, FTL Somalia reported, with the water minister saying the government is funding it in full.
- Launched, as of 24 March 2025
- Power and energy
- Under review
Berbera Electricity Supply and Expansion Project
Somaliland Standard reported in March 2025 that Somaliland's president laid the foundation stone for the Berbera Electricity Supply and Expansion Project, described at the ceremony as World Bank support costing USD 20…
- Completed, as of 22 March 2025
- Road
Burao to Berbera road rehabilitation
The rehabilitation of the Burao to Berbera road. The Somaliland Development Fund announced in March 2025 the completion of 69 km between Sheikh and Berbera, with drainage, new culverts…
- In procurement, as of 7 March 2025
- Power and energy
- Under review
Berbera solar, storage and line tender (World Bank SESRP)
A Ministry of Energy and Minerals tender, reported by ESI Africa in March 2025, for a 12 MWp solar PV plant with 36 MWh of battery storage and a 13.5 km 33 kV line for BEC in Berbera, closing on 5 May 2025.
- Planned
- Port
Berbera port phase 2 and economic zone
An evaluation study for British International Investment, published in December 2025, describes a planned second phase at Berbera port that would raise container capacity to 2 million TEU by extending the quay to 1,000…
How this database is built
Every fact on a project page comes from a named public source: a funder’s appraisal, a tender notice, an agency’s report or a news report, with its date. Each source’s limitations are stated beside it, in our words. A value, a date or a company appears only when a source states it; anything unstated is shown as not published.
A record marked sourced says what its source says and has not yet been checked by the desk; a record marked verified has been. Where two sources disagree, both are shown until the desk decides. Corrections go to the editorial desk.
Contract awards and open tenders are on the tenders and jobs board; tools and data are on the Data Hub.