Business and CostsSomaliland
Construction quality control checklist
Use the construction risk analyzer to find the missing quality controls on a project, then set the hold points, tests and documents that close them.
71 articles on quality control in Somaliland and Puntland, newest first, from Somali Construction Review.
Business and CostsSomaliland
Use the construction risk analyzer to find the missing quality controls on a project, then set the hold points, tests and documents that close them.
Somaliland Sun reported on 2014-11-29 that President Silanyo inaugurated phase one of a Kuwaiti-funded technical school for orphans in Hargeisa.
Wardheer News reported on 2 September 2019 that houses in Kismayo collapsed, leaving at least 47 people homeless. What the report does not establish.
Mustaqbal Media reported on 2022-06-14 that PM Mohamed Hussein Roble inspected construction of the Government House and Prime Minister's Office…
Somaliland Standard reported on 2024-06-02 that Dahabshiil Group laid the foundation stone for a new emergency department at Buhoodle district hospital.
Somaliland Standard reported the Vice President inspected JPLG projects and launched two roads in Berbera, but details remain unverified.
The Ministry of Public Works launched building quality guidelines and registration procedures; engineers without a license will not work, minister says.
Mustaqbal Media reported on 1 September 2023 that four engineers were arrested over alleged structural failures in Hawlwadaag district…
Business and CostsBosaso
An attendance sheet does not show whether an operator can run the plant, so test handover skills on the equipment before acceptance.
Business and CostsHargeisa
A certificate shows the course was attended. Ask a technician to complete a blank test form under observation to see whether the record can actually be written.
Business and CostsBurao
As built drawings training gaps in Burao only matter if a certificate is treated as proof of skill; check the marked up set and the drawing register.
Business and CostsGabiley
Attendance at a snagging course does not prove competence. Check a closed defect list from a real building instead.
Business and CostsHargeisa
Cube crushing is the only proof that your mix met the spec. Here is how to take, cure and send samples without losing the result.
Business and CostsBosaso
A certificate records attendance, not the skill of tracing a repeating defect to its cause. Here is how to test that skill on a Bosaso build.
Business and CostsHargeisa
Attendance at a defect classification course in Hargeisa does not prove a supervisor can rank repair urgency correctly on site. Here is how the gap shows up.
Business and CostsBurao
A certificate can prove attendance rather than competence. Here is how to check whether someone can log, file and retrieve a real test result in Burao.
Business and CostsGabiley
Sample approvals training gaps in Gabiley show up when a certificate proves attendance, not judgement, so finishes vary from room to room.
Business and CostsBosaso
Material receiving training gaps in Bosaso let signed attendance sheets stand in for verified delivered quality. Here is how to test the skill.
Business and CostsHargeisa
Inspection hold points training gaps in Hargeisa let crews pass a course without proving they can sign off concealed work. Here is how to check.
Business and CostsQardho
Check maintenance handover competency in Qardho by asking who ran the plant on the crew's last job and seeing the manual, not a claim.
Business and CostsGarowe
Weak supervision at maintenance handover in Garowe leaves operating knowledge unwritten, so owners inherit plant they cannot run or repair.
Business and CostsBorama
A low bid hides missing maintenance handover work. Check priced handover allowances, spares and access before you award in Borama.
Business and CostsBurao
Handover fails when installers leave before anyone records how the plant runs. Close maintenance handover skills gaps by testing operating knowledge on site.
Business and CostsGabiley
Handover files signed without maintenance experience leave Gabiley clients with no operating knowledge and defects that surface after the final payment.