MaterialsSomaliland
How do you weigh a cement bag to check it is full?
Weigh a sample of bags from each delivery on a calibrated scale and record the result against the bag's stated mass and batch number.
Every published article, newest first. Search by subject or place, or browse by topic.
53 articles
Clear allMaterialsSomaliland
Weigh a sample of bags from each delivery on a calibrated scale and record the result against the bag's stated mass and batch number.
MaterialsNews
Bamburi Cement advocates for procurement scoring and green finance taxonomy changes to boost low-carbon cement in Kenyan public infrastructure.
MaterialsPuntland
Check the strength class, packing date and batch number on every cement bag before it goes into concrete, and record them so a suspect batch can be traced.
MaterialsSomaliland
When a supplier switches plant, quarry or mill, the old test record no longer covers the material. Re-test before the next pour and file the new result.
MaterialsPuntland
Stack cement bags off the floor and away from walls, rotate stock oldest first, and cover loads in transit so Gu and Deyr rain never reaches the paper.
MaterialsSomaliland
Open, feel and weigh bags on arrival, record the batch, and reject bags that have set before they reach the mixer.
MaterialsNews
East African Portland Cement reports profit after tax of Sh1.58 billion for the year ended June 2026, down from Sh5.02 billion, and recommends no dividend.
MaterialsPuntland
Match every delivery to the order before unloading: check the delivery note, bag markings, steel tags and block counts against what the contract specifies.
MaterialsSomaliland
A bag of cement that loses its batch marks cannot be traced to a delivery, so mark batch, date and store position on every stack.
MaterialsNews
Kenya's president announced a Sh70bn cement and clinker factory in Mwingi North, Kitui County, to be developed by Devki Group, with a Tuesday launch.
MaterialsPuntland
Compare cement brands by the same checks on both: bag marking, batch date, storage, a set test and the mill certificate, then hold one rule for both.
MaterialsSomaliland
Read the certificate against the delivery: check the grade, the batch number, the date and the test method, then confirm what the certificate actually covers.
MaterialsPuntland
When a supplier switches quarry, plant or mill, treat the material as new: ask for the batch record, retest, and hold the pour until results are signed off.
MaterialsSomaliland
A dry store on pallets, a bag stack kept off the floor and walls, and a first-in-first-out rule keep cement usable across Somaliland's wet and dry seasons.
MaterialsPuntland
Keep every delivery of cement, steel, blocks and aggregate tied to a signed record, so a rejected batch cannot slip into the structure.
MaterialsSomaliland
Cover stockpiles, separate heaps and a wash check. Dirty sand and aggregate weaken concrete and block, so inspect before batching.
MaterialsPuntland
Steel arrives without mill certificates. Ask for test pieces, check diameter and weight, bend a bar, and file the record before it is fixed.
MaterialsSomaliland
Buy blocks on a written order, check one pallet at a time against it, and get a laboratory compression test on the units before the wall goes up.
MaterialsPuntland
Rust on stored reinforcement follows a predictable chain: salt, moisture, no cover. Break one link, log it, and the steel goes in clean.
MaterialsSomaliland
Test mixing water with a cube comparison and a simple checklist before you batch, because salts and organic matter in local water can attack rebar.
MaterialsPuntland
Keep cement, rebar and blocks dry, off the ground and recorded on one store sheet so the site can show what it received and what it used.
MaterialsSomaliland
Ask the engineer for the chloride exposure class and a written mix design, then hold trial batches and cover checks to that document.
MaterialsPuntland
Keep sand and coarse aggregate on hard standing, divided by size, and recheck them before each pour.
MaterialsSomaliland
Ask the supplier for the batch sheet and dosage, store admixtures as the label states, and run a trial mix before any structural pour.