Construction AI assistant

Ask about open tenders, jobs, construction projects, contractors, material prices, and building codes and laws. The answer comes from our own records, and every line names its source.

Construction projects in Berbera

Automated answer, assembled by software from this site’s records. Check each source before you rely on it.

From the project database, where every fact names its public source.

Summary: The records list several projects in Berbera: a planned 12 MWp solar and 70 MWh storage expansion valued at USD 24 million, a completed 5 MWp solar plant, and launched city water expansion and electricity supply projects, the latter valued at USD 20 million. Also included are a completed Burao to Berbera road rehabilitation, a solar, storage and line tender in procurement under the World Bank SESRP, and a planned Berbera port phase 2 and economic zone. [1][2][3][4][5][6][7]

  1. Berbera 12 MWp solar and 70 MWh storage expansion [1]

    Planned, as of 26 May 2026; Berbera; value USD 24 million; 2 sourced facts.

  2. Berbera 5 MWp solar plant (Global South Utilities) [2]

    Completed, as of 19 February 2026; Berbera; value not published; 3 sourced facts.

  3. Berbera City Water Expansion Project [3]

    Launched, as of 24 March 2025; Berbera; value not published; 1 sourced fact.

  4. Berbera Electricity Supply and Expansion Project [4]

    Launched, as of 24 March 2025; Berbera; value USD 20 million; 1 sourced fact.

  5. Burao to Berbera road rehabilitation [5]

    Completed, as of 22 March 2025; Berbera; value not published; 3 sourced facts.

  6. Berbera solar, storage and line tender (World Bank SESRP) [6]

    In procurement, as of 7 March 2025; Berbera; value not published; 2 sourced facts.

  7. Berbera port phase 2 and economic zone [7]

    Planned; Berbera; value not published; 3 sourced facts.

Sources

  1. Berbera 12 MWp solar and 70 MWh storage expansion
  2. Berbera 5 MWp solar plant (Global South Utilities)
  3. Berbera City Water Expansion Project
  4. Berbera Electricity Supply and Expansion Project
  5. Burao to Berbera road rehabilitation
  6. Berbera solar, storage and line tender (World Bank SESRP)
  7. Berbera port phase 2 and economic zone

Next: The project database

A short summary by the model appears when it can add one.

What it is for

A quick way into the site’s records: the tenders and jobs board, the project database, contract awards, material price observations, and the codes and laws pages. It points you to the record and its source; it does not replace reading them.

How it works

  1. Your question is read for what you want (tenders, jobs, projects, contractors, a price, a rule) and for a place, a material or a trade.
  2. The matching records are fetched from the site’s database. If nothing matches, it says so instead of guessing.
  3. Each line of the answer carries a numbered source: a page of this site, or the official source stored with the record.
  4. When a model is configured, it may add a summary of those same records and nothing else. It is configured.

Assumptions

  • A place is recognised from the site’s list of places in Somaliland, Puntland and Somalia; other places are not.
  • “This week” means the next seven days from today; “this month”, the next thirty.
  • Contractors are the firms named as awarded bidders in World Bank contract award notices; other funders are not covered yet.

Example

Asking “Cement price in Hargeisa” returns the recorded cement observations for Hargeisa, newest first, each with the factsheet table it came from, and says that one district figure is not a market price.

Limitations

  • It answers only from what the site holds. A missing record means we have not documented it, not that it does not exist.
  • It is not legal, engineering or financial advice, and it never certifies, approves or rates anyone.
  • Questions are not stored. When a model is configured, your question and the matching records are sent to it to write the summary. To keep the tool available for everyone there is a limit of at most 12 questions every 10 minutes from one connection.

Related guides

More in Business and Costs.

More tools and data are on the Data Hub.