Engineering and MethodsHargeisa
How do you check paint preparation skills in Hargeisa?
Paint fails from what happens before the first coat. Check mixing, dust, damp and curing records before you sign off a Hargeisa finish.
Analysis, method and practical guidance for building across Somaliland and Puntland: what the evidence supports, what it costs on site, and what to do differently tomorrow.
1191 articlesshowing 481 to 504
Engineering and MethodsHargeisa
Paint fails from what happens before the first coat. Check mixing, dust, damp and curing records before you sign off a Hargeisa finish.
Business and CostsGarowe
Low bids can hide logistics gaps in Garowe, such as blocked work access and omitted handling. Check the method statement and billed hours before award.
Business and CostsGarowe
Claims of tool handling competency in Garowe prove nothing on their own. Check certificates, test records and a supervised trial task instead.
Engineering and MethodsQardho
Claims about hot work planning competency in Qardho prove nothing. Here is how to test them before welding and grinding start on site.
Business and CostsGabiley
Defect classification skills gaps in Gabiley can hide urgent repairs behind cosmetic labels. Here is how to check the call and close the gap.
Business and CostsGabiley
A rework allowance in a Gabiley bid can mask a gang that cannot do the work, turning a priced item into unplanned correction costs for the client.
Business and CostsHargeisa
Unanswered tender clarifications in Hargeisa lock pricing assumptions into the contract, and those assumptions show up later as workmanship defects.
Business and CostsBorama
Ask for the evidence behind each skill claim: test records, a recent site you can walk, and the named person who will do the work.
Infrastructure and ServicesBerbera
Pump installation supervision gaps in Berbera show up as missing records: flush, alignment and rotation checks never signed before first start.
Engineering and MethodsHargeisa
A certificate proves attendance, not site skill. Ask the provider for the assessment record behind it, then check alignment on site.
Infrastructure and ServicesBerbera
Ask for evidence, not assurances. Commissioning records, pressure test logs and named refrigerant handling show whether a cooling installer can do the work.
Ground and FoundationsBosaso
A certificate shows attendance, not skill. Check foundation waterproofing in Bosaso by testing laps, thickness and the tanking detail itself.
Infrastructure and ServicesBorama
Check asphalt temperature at the plant, on arrival and behind the paver with a probe, and compare records before you accept the mat.
Engineering and MethodsQardho
Low paint preparation bids in Qardho usually leave out filling, dust removal and curing time, so the finish peels. Check the bill of quantities line by line.
Engineering and MethodsBosaso
Roof inspection gaps in Bosaso show up at parapets, eaves and wall heads. Here is how to close them with hold points and written records.
Attendance certificates do not prove a worker can cure concrete. Here is how the gap shows up as early surface cracking in Burao, and how to check it.
Infrastructure and ServicesAnalysisHargeisa
Somaliland Chronicle's 17 October 2025 review says the mayor elected in May 2021 oversaw 104 km of new or rehabilitated roads in Hargeisa.
Business and CostsAnalysisSomaliland
A World Bank aide-memoire of February 2025 records eight ring-fenced sites and third-party implementers for Sool and Sanaag under Barwaaqo.
Infrastructure and ServicesAnalysisGarowe
The World Bank's June 2026 results story says SURP-II has reached nearly 700,000 people in seven cities and names Garowe's Gambol Bridge.
Business and CostsAnalysisBerbera
A BII and FCDO study by Itad and Steward Redqueen estimates Berbera port, its supply chains and the economic zone supported about 2,490 jobs in 2024.
Business and CostsAnalysisGalkayo
Garowe Online reported on 4 July 2025 that the Xarfo to Galkayo road was to be AfDB funded until federal insistence on Mogadishu contracting.
Infrastructure and ServicesAnalysisBerbera
Ecofin Agency reported on 19 February 2026 that GSU estimates its 5 MWp Berbera solar plant will generate about 10,000 MWh a year.
Business and CostsAnalysisBurao
Somaliland's health ministry reported on 21 August 2025 that a foundation stone was laid for a multi-specialty hospital in Burao, without size, cost or dates.
Business and CostsAnalysisBerbera
A December 2025 BII and Itad study records the Berbera Economic Zone, a special economic zone 15 km from the port along the Berbera corridor.