In brief

  1. A low bid often means the estimator priced the work for people who cannot actually do it, so the practical assessments behind the price are the real thing to check.
  2. Ask for named workers, their test records and a method statement tied to the Qardho site, not just a completed schedule of rates.
  3. Test one key trade on site before award, or write the test into the contract, so the price and the skill match.
Contents
  1. Where does the gap start in a Qardho tender?
  2. What does the gap do to the work?
  3. How do you detect and close the gap?
  4. What to do next

Practical assessments underbidding risks in Qardho come down to one question: does the price include workers who have actually done this task before? A low tender is not proof of cheating. It can simply mean the estimator counted on a crew whose practical competence was never checked, so the skills were assumed rather than assessed. That gap is where the money and the quality disappear.

Where does the gap start in a Qardho tender?

The gap starts when the bill of quantities lists work items but never asks who will do them. An estimator can price a concrete pour, a block wall or a roof frame using labour rates from a crew that has never formed that detail. The tender pack then looks complete, because the paperwork asks for a price, not a method. If the bidder names no foreman, no plant and no sequence, treat the low figure as an allowance for work that has not been planned. General practice is that a tender should name the key trades and the person responsible for each, though the exact form depends on what the contract and the engineer's specification require. Ask what the specification says before you demand it.

What does the gap do to the work?

When the assessment was never done, the crew learns the detail on the client's time. A wall goes up out of line, a pour is worked before the formwork is checked, or a roof frame is fixed with the wrong spacing. Each hour spent correcting it costs the same whether the bid was low or high. The bidder who omitted the cost of skilled labour, a survey check or a test now has no allowance to fix the result, so the correction is either paid for as a variation or left in the building. A defect can show up in blockwork, concrete cover and rainwater details, where a small error is hard to see until water reaches the work. The mechanism is simple: an unassessed crew makes defects, the low bid has no room for rework, and the client meets the cost later.

How do you detect and close the gap?

Set one practical test on the trade that carries the most risk for the project, and run it before award. For blockwork, ask two masons to build a short panel to the specification and check line, level and joint thickness. For concrete, ask for a witnessed practical test, such as a trial pour or a sample panel built to the specification, and check current mix records as supporting evidence. For a roof or a waterproofing detail, ask for a sample section on site. Record who passed and which workers will attend. Write the test into the tender clarification and the contract, and check what your contract allows before you link payment or the award to the result.

What to do next

Before you award, send every bidder the same short question: name the foreman, the crew size, the plant and the test records for the highest-risk trade. Then run one practical test on site with your engineer present, and keep the written result in the contract file. The price is only as reliable as the people who will do the work.

Frequently asked questions

Is a low bid in Qardho always a bad bid?

No. A low bid can come from a lean but well-organised contractor. The risk is not the number itself but whether the bid includes the labour, plant and testing needed for the work. Ask for names, test records and a method statement, then test one trade on site.

Can I ask for a practical test before awarding the contract?

Yes, as a clarification in the tender process. Keep the test the same for every bidder so the comparison stays fair, and check what the tender rules and your contract allow before you make the result a condition of award.