In brief

  1. When no mentor is on site, trainees keep working after their sign-off stops, and no one replaces that check.
  2. Ask for the mentor's name and weekly hours in writing, then compare site records against that person's attendance.
  3. Close the gap with one named checker per trade, a sign-off sheet, and staged inspections rather than a final walk.
Contents
  1. What does a supervision gap look like on a Qardho site?
  2. What does weak supervision miss in the work?
  3. How do you close the gap without adding a full team?
  4. What to do next

Mentor availability supervision gaps in Qardho arise when the person who signs off a trade is not on site. A trainee who has not been signed off keeps laying block or fixing membranes, no senior person reviews the detail, and the defect appears after handover. What goes missing is the person whose job is to look.

What does a supervision gap look like on a Qardho site?

A supervision gap appears when fewer people are able to sign off work than the job needs, so sign-off happens late or not at all. One senior person may cover several trades, and when that person is pulled to a delivery or a client visit, the check is skipped and not done later.

Trainees then repeat a mistake until it becomes the site's normal. Mortar gets mixed by eye, blockwork goes up without a line, and cover to steel is judged from the top of the trench rather than the side. Nobody catches it because the only person who could has moved on.

Check the local situation by asking the contractor for the mentor list: names, trades, and hours on site each week. Ask the municipal engineer's office what records it expects to see. Then walk a recent site and ask two workers who signs their work. Check whether the named mentor is genuinely available for the inspections the trade needs, and put the answer in writing before work continues.

What does weak supervision miss in the work?

Weak supervision misses the steps that are cheap to fix early and expensive to fix later. Cover, curing and fixing are the usual ones, because all three disappear behind the next trade within hours.

Concrete cover is a general-practice item set by the project's specification, and it is confirmed against the drawings and the engineer's instruction, not from memory. Curing duration is the same: the specification names it, and someone has to record when it started and when it ended. Fixing spacing and edge distance follow the structural drawings. None of these can be checked from a photograph taken a week later.

Missed inspections also affect records. If no one signs the pour sheet, the client cannot tell later whether the concrete was placed in one run or two, or whether the trench was dry. That gap matters when a crack appears and the cause has to be found.

Detection is simple: pick three completed elements and ask for the inspection record for each. If the records stop at the point where the mentor left, the gap is real.

How do you close the gap without adding a full team?

You close it by naming one checker per trade and giving that person the hours to do it. A single senior person can cover blockwork and fixing if the programme allows a staged inspection before each pour or cover-up.

Use a one-page sign-off sheet per element. It lists the checks, the specification clause, and the name of the person who passed it. Trainees sign the work they did, the checker signs the work they inspected, and the supervisor reviews the sheet weekly. That way a trainee's progress is visible, and so is the mentor's.

Where a mentor is genuinely unavailable for a trade, the honest options are to hold that trade, bring in a checker for the inspection days, or agree a staged handover with the client. Ask what the contract allows before changing the programme, and put the change in writing.

Hold a short weekly review on the three elements due for cover-up next. It takes less time than fixing a rejected pour.

What to do next

Ask the contractor for the mentor list today: names, trades, and hours on site each week. Compare it against the site diary and the last three inspection records. Where a trade has no available checker, agree in writing with the client on a staged inspection or a hold before the next cover-up.

Frequently asked questions

How many mentors should a Qardho site have?

There is no fixed local number. Work out how many inspections each trade needs before cover-up, then check whether the named mentors have the hours to attend those inspections. Put the result in the contract or the site plan.

What records show a mentor gap?

Look at the inspection and pour sheets. If sign-offs stop partway through an element, or one name covers several trades on the same day, the mentor was not available when the check was due.

Can a trainee sign off their own work?

No. The person who did the work should sign that they did it, and a separate checker should sign that they inspected it. Ask the engineer or the municipal engineer's office which records they expect to see.

Local reporting: this article is written for building work in Qardho and Puntland. Ground conditions, prices and rules differ between places; confirm the details for your own site.